Skip to content

Level Two

LEGACY
INSTALLATION

The architecture is translated into operating reality.

Installation moves the work from belief, to behaviour, to infrastructure: organizational systems, leadership tools, brand expression, communication, training, and implementation.

Investment

Typically CAD $100,000–$300,000+

Timeline

Typically 4–12 months

Precedes it

Diagnostic + Architecture

Architecture on paper changes nothing. Installation is where the organization starts running on it.

Possible workstreams

Built from the diagnosis. Not from a menu.

Installation draws on three families of workstreams. Which ones a given mandate includes, and in what depth, is decided by the diagnostic, not by a package.

Organizational systems

  • Hiring standards
  • Onboarding systems
  • Leadership expectations
  • Meeting structures
  • Feedback loops
  • Decision frameworks
  • SOP alignment
  • Communication protocols

Brand and expression

  • Brand positioning
  • Visual identity
  • Employer brand
  • Website
  • Internal films
  • Campaigns
  • Internal storytelling
  • Customer-experience alignment

Knowledge and infrastructure

  • Founder documentation
  • Knowledge-transfer systems
  • Training materials
  • Digital systems
  • Marketing automation where strategically relevant

Clarification

Not every organization requires every workstream. The final mandate is determined by the Legacy Diagnostic and approved scope.

Questions

Frequently asked.

Next step

Installation starts with a diagnosis.

If founder dependency is the problem, the first conversation determines whether a diagnostic (and eventually an installation mandate) is the right path.